When you need an exemption
A privately rented home must be rated at least E on its EPC to be let, under the Minimum Energy Efficiency Standard (MEES). If it is F or G, you have two options: improve it to E, or register a valid exemption. Letting an F or G home without either can bring a fine of up to £5,000 per property. For the full rules and what’s coming in 2030, see New EPC rules for landlords.
An exemption only applies from the moment it is registered on the PRS Exemptions Register. It isn’t a defence you can find after the council writes to you.
The six exemptions today
| Exemption | When it applies | Evidence | Lasts |
|---|---|---|---|
| All relevant improvements made | You’ve done every relevant improvement (within the cap) and it’s still below E | Details and dates of the improvements; a surveyor’s report if not based on the EPC | 5 years |
| High cost | The cheapest relevant improvement costs more than £3,500 inc. VAT | Three quotes from qualified installers | 5 years |
| Wall insulation | The only relevant measures are wall insulation, and they would harm the building | Written expert opinion that they would damage the fabric or structure | 5 years |
| Third-party consent | Consent is needed and has been refused — a tenant, a lender, a freeholder or the planning authority | The correspondence showing consent was sought and refused or made conditional | 5 years, or until the tenancy ends where the tenant refused |
| Devaluation | The improvements would cut the property’s value by more than 5% | A report from an independent valuer on the RICS register. I’m an RPSA surveyor and don’t do valuations, so this has to be commissioned separately | 5 years |
| New landlord | You’ve just become the landlord, for example by buying a tenanted home | The date and circumstances | 6 months |
How to register
- Get a current EPC. The exemption is assessed against it.
- Gather the evidence for the exemption you’re claiming (the table above). Files can be PDF, image or Word documents, up to 20 MB each.
- Register on the PRS Exemptions Register, which is free.
- Diary the expiry. When it runs out you must either improve the home or register again, if you still qualify.
You can end an exemption from the register dashboard once the home reaches E or you stop letting it.
The mistakes I see
- Claiming “high cost” without checking the cheap measures. The test is about the relevant improvements on the EPC. If loft insulation or low-energy lighting would lift the home to E for a few hundred pounds, the high-cost exemption doesn’t apply.
- An out-of-date or poorly evidenced EPC. A home can sit at F simply because insulation and heating upgrades weren’t recorded. A fresh, careful assessment sometimes removes the need for an exemption altogether.
- Letting first, registering later. The exemption only counts from registration.
- Forgetting the five-year clock. Exemptions expire, and the council can check the register.
Listed buildings
Being listed is not one of the six exemptions. Whether a listed home needs an EPC at all is a separate question — see Do listed buildings need an EPC? — and where works would need listed building consent that is refused, the third-party consent exemption can apply.
What changes in 2030
Under the government’s plan for EPC C by 1 October 2030, there will be eight exemptions: high cost, all relevant improvements made, cost cap, property value adjustment (affordability), solid wall insulation, negative impacts (replacing devaluation and wall insulation), third-party consent and new landlord. The cost cap, property value and negative impacts exemptions would last ten years, the others five. The cap rises to £10,000 over ten years, or 10% of the property’s value if lower. None of this is law yet.
I can provide the EPC an exemption is assessed against, model what each improvement would do to the rating, and — through a retrofit assessment — the building-physics evidence behind a wall insulation case. See EPCs for landlords, or get in touch with the address.
Quick answers
Can I rent out a property with an F or G EPC?
Only if you have registered a valid exemption on the PRS Exemptions Register before relying on it. Otherwise the home must be improved to at least E.
How long does an EPC exemption last?
Five years for most exemptions. The new-landlord exemption lasts six months, and a third-party consent exemption based on the tenant refusing ends with that tenancy.
Does it cost anything to register an exemption?
Registering on the PRS Exemptions Register is free. You pay only for the evidence, such as an EPC, installer quotes or an expert report.
Sources. Domestic private rented property: minimum energy efficiency standard — landlord guidance (updated 5 May 2026); PRS minimum energy efficiency standard exemptions; DESNZ government response on privately rented homes (updated 21 January 2026).
Disclaimer. This post is general guidance, not legal advice. Proposals can change before they become law. Correct as of 12 November 2026.